logo

360º View Of AMALTAS 71 Chembur Property

WHERE DESIGN MEETS ELEGANCE MEETS YOU

officeimage
areaimage

UNIQUE LOCATION

HIDDEN IN THE MOST SERENE STRETCH OF CHEMBUR, YET CLOSE OF EVERYDAY CONVENIENCES. LIKE CHEMBUR STATION 100 METER, MONORAIL STATION 700 METER, METRO II 1 KM, EASTERN FREEWAY 1 KM, CHEMBUR MARKET 150 METER, EASTERN EXPRESS HIGHWAY 2 KM AND SANTACRUZ CHEMBUR LINK ROAD 1 KM

map1
map2

CLASSIQUE DESIGN

Perfect square, clean lines and modern building facade.

A central atrium opens to the sky. Designed for natural wind and ventilation.

Grand entrance lobby with heightened ceiling.

Floor to ceiling aluminium glazed windows.

Ceramic tile & timber flooring.

Efficiently planned with no wastage of space.

Option for an open entertainer’s kitchen or a concealed wet kitchen.

homedesign1
homedesign2
homedesign3
homedesign4
logoinner

SENSIBLE AMENITIES

  • Gymnasium and yoga room.
  • Terrace lounge for entertaining.
  • Cctv & 24 hour manned security electronic surveillance system.
  • Sustainable living with solar energy for common amenities
  • Rain water harvesting.
  • Card access.
  • System fire protection & detection system.
  • Broadband infrastructure.

FLOOR PLANS

image-1
image-1
image-1
image-1

TRUSTED EXPERIENCE

Carrying forward the MITTAL Legacy that is synonymous with developing some of the landmarks that shape Mumbai and South Mumbai in particular, Tattva Mittal, brings to the fore professionalism and innovation with a deep sense of community. Guided by a culture of integrity and transparency, Tattva Mittal aims to make a difference in the redevelopment market of Mumbai, with a focus on old tenanted municipal properties. With a belief that ‘good living’ combines thoughtful locations, efficient design, user-centric facilities, optimisation of technologies and real pricing, Tattva Mittal defines ‘Good Living’ as ‘Smart Living’.

office

Call +91 90290 02555

Tattva Mittal Group

A0 ground floor, Benefice Business House, Mathuradas Mill Compound, Lower Parel (West), Mumbai 400013.

Construction Update

worknew

18th June 2018

We have come a long way in 6 months.

In progress : External retaining wall for Car pit lift and underground water tank slab

image-1
image-1
image-1
image-1
footer-logo
trakimage